Tunnel Boring Lab teaching notes
For middle and high school engineering, computer science, earth science and construction teachers. These notes cover a first period, the levels, the misconceptions the app is built to confront, and what it leaves out.
Using this with a class? Make a free class and add your students yourself: each gets a username and password, with no email or Google account needed. Or give them one join code. Using Google Classroom? Post the link there; with a free class, the link also puts each student in your class, so you see their work. mytekDev is also available from the Google Workspace Marketplace, so your school's Google admin can install it for everyone.A first lesson: Open it on the projector at Level 1 and press play. The starter pushes the machine 1.6 m forward and builds the first ring of the lining. Ask the class what holds the hole up while the machine digs, and how anyone steers a machine underground that cannot see. Then open Level 2 and run the same starter: the line curves, the machine goes straight, and the guidance screen shows it drifting off. Ask which side to push harder on.
Set up a free class Share to Google Classroom- About these notes
- A first period
- The levels
- What students get wrong, and where the app answers it
- What the app simplifies, on purpose
- For construction and CTE classes
- Setting it up for a class
- Standards
About these notes
Tunnel Boring Lab is a tunnel boring machine under a city street, programmed in Blocks or Python. The ground is cut open along the line like a diagram: topsoil, sand with the water table in it, clay, and granite. The machine bores 1.6 m a stroke, builds a ring of the lining behind itself, and is steered by pushing harder on one side, read by a laser guidance screen. The machine's size, its rings and the 50 mm limit come from London's Crossrail tunnels; the cutters' ratings and top speed from published cutter data, rounded.
All 14 levels are open, and each saves its best drive. Machine, Configurator changes the machine every level runs: its size, its cutters, its shield and its name.
A first period
Levels 1 and 2 fit in a period, with time to talk about steering something that cannot see.
- Run the starter (10 minutes) Open Level 1 and press the round play button or the space bar. The starter pushes on all four groups of cylinders alike, turns the cutterhead, bores one stroke and builds a ring: seven segments and a key. Before it runs, ask what holds the hole up while the machine digs.
- Drift off the line (10 minutes) Open Level 2 and run the same starter. The line curves left, the machine goes straight, and the dot on the guidance screen moves right of the middle until it leaves the 50 mm circle. Ask how anyone would steer a machine underground.
- Steer it (15 minutes) In the push block, make the right number bigger than the left: pushing harder on the right turns the machine left. About 80 on the right with 50 on the left follows this curve. Run it, and watch the guidance screen ring by ring.
- Talk (10 minutes) Ask why a push set once at the start works here, and whether it would still work if the curve changed halfway. Level 3 steers the same curve with turned rings instead, and Level 13 needs a program that reads the guidance every ring.
The levels
Each level opens with one idea and a task card that says what to do. The readings box gives the push, the cutterhead's speed, the force on each cutter and the face pressure as the machine bores, and the result names what went right or wrong.
| Level | The job | What it is built to show |
|---|---|---|
| 1. First stroke | Bore one stroke and build one ring | The tunnel is lined as it is bored, ring by ring |
| 2. Stay on the line | 20 rings within 50 mm on a gentle left curve | Steering by pushing harder on one side; the guidance screen |
| 3. Rings that turn | The same curve with the push even all round | Tapered rings: one in five turned left follows the curve |
| 4. Hard rock | 10 rings of granite in under 9 hours, no cutter past its rating | Cut per turn grows with the force on each cutter, up to the rating; the rim sets the top speed |
| 5. Worn cutters | 15 rings of granite, no cutter worn through | The rim cutters roll farthest and wear first; change them past 80% |
| 6. Mixed ground | 20 rings with rock below and clay above | An uneven face pushes the machine up; push harder on the top |
| 7. Hold the face | 10 rings with the face pressure within 0.3 bar of its target 90% of the time | A control loop: the screw against the advance |
| 8. The buildings above | 25 rings under shops and flats, each inside its 10 mm trigger | The settlement trough, survey points and trigger levels |
| 9. Below the water table | 10 rings in wet sand | Water pressure adds to the face; a slurry machine holds wet sand |
| 10. A boulder | 12 rings with a boulder in the clay, no cutters chipped | Events: a program that reacts the moment something happens |
| 11. Under the subway | 20 rings under an old subway tunnel | Settlement under a structure in the ground, near the tunnel |
| 12. Grout the gap | Level 8's street with the grout turned on | The gap behind the rings and what filling it saves |
| 13. Breakthrough | 30 rings with everything at once, into the reception shaft | The whole drive, scored on the line, the street, the cutters and the time |
| 14. Your route | A route the student builds | One program tested on many routes |
Programs push with tbm.push(top, bottom, left, right), turn the cutterhead with tbm.spin, bore with tbm.stroke and line with tbm.build_ring. They read tbm.deviation, tbm.ground, tbm.force, tbm.torque, tbm.pressure and tbm.settlement, change cutters with tbm.change_cutter, work the screw with tbm.screw while tbm.bore runs, and react with tbm.on("boulder", a_function). Blocks run as the same Python, and the Python tab shows it. Help, How it works lists every command.
What students get wrong, and where the app answers it
| What students think | Where the app answers it |
|---|---|
| The machine digs the tunnel and the walls go in afterwards | Level 1: a ring of the lining goes in after every 1.6 m stroke, and the machine pushes off it to move. |
| It steers like a car, with something that turns at the front | Level 2: there is no steering. Pushing harder on the right turns it left, a little each stroke. |
| The driver can see where the tunnel is going | Level 2: the machine is steered blind, by a laser that measures how far its head and tail are off the line. |
| Push harder and spin faster to go faster | Level 4: each cutter has a rating, and the rim cutters a top speed. Past the rating the level stops. |
| All the cutters wear the same | Level 5: the cutters near the rim roll much farther each turn and wear first. |
| Digging underground does not touch the street | Level 8: every ring takes a little ground, and the survey points on the buildings show the street sinking. |
| More pressure at the face is always safer | Levels 7 and 8: too little and the face runs in; more than the ground's own weight and the street heaves up. |
| A program runs top to bottom and nothing can interrupt it | Level 10: the boulder arrives mid-stroke, and only an event catches it in time. |
What the app simplifies, on purpose
- The machine is one stiff body. The ground changes along the route and with depth, but not from side to side.
- Distances off the line are drawn 10 times bigger, in the picture and on the guidance screen's route, so a few centimeters show. The numbers are true.
- A "straight" ring stands for the left and right ring real crews build in turn on a straight stretch.
- The cutters wear out a few times faster than real ones, so a student sees it happen in one drive.
- The machine never stops for repairs or for the spoil trains, so it goes faster than a real machine's average: Crossrail's averaged 7 to 22 m a day counting every stop.
- A slurry machine has no screw; pumps carry its spoil away. Here tbm.screw runs those pumps.
- Real projects set two or more trigger levels on each building. The app's trigger is the last one, where work stops.
- Nothing caves in on anyone. Buildings above settle up to about 10 mm in these levels, shown as numbers, and never fall.
For construction and CTE classes
The machine is a pressure-balance tunnel boring machine for soft ground: a cutterhead with disc cutters and scraper teeth, a shield, thrust cylinders in four groups, a chamber held at pressure by the dug soil, and a screw that carries the spoil out. The configurator swaps in a slurry machine for wet sand or an open gripper machine for hard rock, and changes its size from 3 to 8 m across.
File, Drive record prints the drive the way a tunnel crew logs it: the route from above, how far off the line the machine was ring by ring, the ring log with each ring's turn and face pressure, the settlement at each building, the cutters changed, and the program that drove it.
It is not engineering training. A real drive adds geotechnical surveys, a crew of dozens and a site's own safety rules, which a construction program teaches on its own.
Setting it up for a class
No setup is needed. With free accounts, each student's levels, best drives, programs and machine save as one project. A shared project replays the student's last drive in the cutaway. Typed words in a shared project pass the platform's filter.
Big screen hides the menus for a projector. Slower and Speed up change how fast time runs underground; a program's wait is the drive's own time at any speed. The camera button switches between the cutaway, a view that follows the machine, and a view above the street.
Standards
- NGSS MS-ETS1-1 to 4 and HS-ETS1-4: a computer simulation used to test solutions against criteria (the 50 mm line, the time) and constraints (the cutters' rating, the face pressure, the buildings' trigger).
- NGSS MS-PS2-2: pushing harder on one side changes the machine's motion, one variable at a time.
- CSTA 2-AP-12 (loops and conditionals that steer from a sensor), 2-AP-17 (one program tested on several routes, Level 14), 3A-AP-16 (events, Level 10) and 3A-AP-15 (a set push against a loop that reads the guidance).
- CCSS 6.EE.A.2 and 7.EE.B.4: Level 7's target pressure is an expression in the depth and the water depth, written into the program.
Middle school can stop at Level 6: steering, rings and the cutters' limits need no formula. The target pressure, the control loop and events are high school.