Tunnel Boring Lab
A tunnel boring machine cannot see where it is going. It bores 1.6 m, stops, lines the hole behind itself with a ring of concrete, and bores again, steered by a laser and by pushing harder on one side. Tunnel Boring Lab gives every student one of these machines, a sunny street to go under, and a program to write in Blocks or Python. They keep it within 50 mm of the line, press its cutters into granite up to their rating, hold the ground at the face with a pressure loop so the shops and flats above stay inside their 10 mm trigger, and slow down the moment the cutterhead hits a boulder. Nobody is hurt and nothing falls: the numbers do the teaching.
Using this with a class? Make a free class and add your students yourself: each gets a username and password, with no email or Google account needed. Or give them one join code. Using Google Classroom? Post the link there; with a free class, the link also puts each student in your class, so you see their work. mytekDev is also available from the Google Workspace Marketplace, so your school's Google admin can install it for everyone.A first lesson: Open it on the projector at Level 1 and press play. The starter pushes the machine 1.6 m forward and builds the first ring of the lining. Ask the class what holds the hole up while the machine digs, and how anyone steers a machine underground that cannot see. Then open Level 2 and run the same starter: the line curves, the machine goes straight, and the guidance screen shows it drifting off. Ask which side to push harder on.
Set up a free class Share to Google ClassroomHomeschooling? A step-by-step kit uses Tunnel Boring Lab and ends with a certificate. See the kit
What a student actually does
Level 1 runs a starter program: push on all four groups of thrust cylinders alike, turn the cutterhead, bore one stroke of 1.6 m, then build a ring of the lining: seven concrete segments and a smaller key, set one at a time. The tunnel is lined as it is bored.
Level 2 asks for 20 rings within 50 mm of the line, the limit London's Crossrail tunnels worked to. The line curves left and the starter goes straight, so the guidance screen shows the machine drifting off. The student steers it by pushing harder on the right. Level 3 does it with rings instead: each ring is a little longer on one side, and one in five built turned left follows the curve.
Levels 4 and 5 are hard rock. Each cutter cuts deeper the harder it is pressed, up to its rating, and the cutterhead turns only as fast as its rim cutters may roll, so 10 rings in under 9 hours means working near both limits. The rim cutters wear first; the student reads their wear after each ring and changes any past 80%. Level 6 has rock in the bottom of the face and clay over it, and the machine rides up until it is pushed harder on the top.
Level 7 turns it into a control loop. Soft ground at the face is held up by the dug soil packed in a chamber; the screw carries it out, faster to lower the pressure, slower to raise it. The program works out the target pressure from the depth and the water, starts a stroke without waiting, and adjusts the screw while it bores. Level 8 runs under a row of shops and a block of flats: survey points on them give how far each has sunk, and the drive must keep them inside a 10 mm trigger without pushing the street up.
Level 9 bores below the water table, where a pressure-balance chamber leaks; Machine, Configurator swaps in a slurry machine. Level 10 hides a boulder in the clay: the program has to catch the moment it hits, with an event, and slow down before the cutters chip. Level 11 passes under an old subway tunnel, Level 12 turns on the grout, and Level 13 does everything at once to a breakthrough into the reception shaft. Level 14 is a route the student builds.
Machine, Configurator sets the machine's size from 3 to 8 m across, its cutters and its shield, and gives it a name. File, Drive record prints the drive on one page: the route from above, how far off the line it was ring by ring, the ring log with each ring's turn and face pressure, the street's settlement, the cutters changed and the program.
The starter in the Blocks tab: push, spin, then bore and build a ring, twenty times. Blocks and Python call the same commands, and the Python tab shows what the blocks say.
What they are learning while they work
Nothing here is presented as a lesson. This is what the levels are made of.
| What the student does | What it is |
|---|---|
| Builds a ring behind the machine after every stroke | Lining as you go. The hole is never left open. The machine pushes forward off the last ring it built, so the lining is what it pushes against. |
| Pushes harder on the right to turn the machine left | Steering by thrust. There is no steering wheel. Pushing harder on one side turns the machine away from it, a little each stroke. |
| Reads the guidance screen after each ring | Feedback from a sensor. A laser on the tunnel wall says how far the head and the tail are off the line. A 0.1 degree error left alone is 56 mm off after twenty rings. |
| Presses the cutters into granite up to their rating | Working to a limit. Pressed harder, each cutter cuts deeper each turn. Past its rating the bearing inside it wears out early, so the level stops. |
| Changes the rim cutters before they wear through | Wear and maintenance. A cutter near the rim rolls much farther each turn than one near the middle, so it wears first. A change costs time; a cutter worn through costs the drive. |
| Runs the screw faster or slower to hold the face pressure | A control loop. Read the pressure, compare it with the target, adjust the screw, and read again while the machine bores. Too low and the face runs in; too high and the street heaves. |
| Keeps the buildings above inside their trigger | Settlement. Every ring takes a little ground with it, and the street sinks in a gentle trough, deepest over the tunnel. Holding the face well keeps it inside the buildings' trigger. |
| Slows down the moment the cutterhead hits a boulder | Events. A program that is waiting for a stroke to end cannot see the boulder. A when block, or tbm.on in Python, runs at once when it happens. |
How to tell whether it landed
Ask, and let them show you on the machine. A student who has understood it can answer these without help.
- What holds the hole up while the machine is boring, and what holds it up afterwards?
- The machine is 30 mm to the right of the line. Which group of cylinders do you push harder on, and why?
- Why can't you just push harder and spin faster to get through the granite sooner?
- Which cutters did you change first, and why those?
- Your face pressure is under the target. Do you run the screw faster or slower? What happens to the street if you get it wrong?
- Your program was waiting for a stroke to end when the boulder came. How did it know to slow down?
Use it in your subject
Not a technology class? Then the app is how students show what they learned in your unit. More projects for every subject.
Engineering design (NGSS MS-ETS1-1 to 4, HS-ETS1-4)
A computer simulation used to test a solution against criteria and constraints: the 50 mm line, the cutters' rating, the face pressure and the buildings' trigger, with one program tried on several routes.
Computer science (CSTA 2-AP-12, 2-AP-17, 3A-AP-16)
Loops and conditionals that steer from a sensor, a feedback loop that holds a pressure, events that interrupt a program waiting on a stroke, and one program tested on a route of the student's own.
Earth science and physical science
Topsoil, sand, clay and granite and how differently they behave when dug; the water table as water filling the gaps between grains; water pressure growing with depth, about 1 bar for every 10 m.
Construction and career and technical education
What a tunnel boring machine is made of, how a tunnel is lined and surveyed, and why crews watch the buildings above. Tunnelling is how cities build subways, sewers and water mains without digging up the street.
Practical notes
- AgesGrades 6 to 12. Levels 1 to 3 work from grade 6 with no formula; the target pressure, the control loop and events fit high school CS, physics and engineering.
- TimeLevels 1 and 2 fit in a class period with time to talk about steering. Levels 1 to 8 together take about three periods; Levels 9 to 13 another two or three.
- EquipmentA computer or Chromebook with a modern browser. Nothing to install. A projector for Big screen.
- CostFree. The app has no paid tier and no AI.
- PrepRun Level 1's starter once, then steer Level 2 to 20 rings yourself by pushing harder on the right. Before Level 7, read The face and the screw in Help, How it works.
- In a groupOne machine per student, or pairs: one writes the program, one reads the guidance screen and the readings aloud each ring.
For classes that will never see a tunnel being bored
A tunnel boring machine works out of sight, under a street, for months, and a class will never stand behind one. Here every student drives one at once, sees the ground cut open like a diagram, and finds out for themselves why the machine is steered by pushing and why the buildings above are watched to the millimeter. The street is always sunny, nobody is hurt, and buildings never fall.
Common questions
Is it free?
Yes. Tunnel Boring Lab has no paid tier, and it can be tried right on this page without an account. Saving needs a free account.
Does it work on a Chromebook?
Yes. It runs in the browser with nothing to install.
Do students need to know how to code?
No. Level 1 runs a starter program, and the Blocks tab is drag and drop. Python is there for students who want it, and the Python tab shows what the blocks say.
Are the numbers real?
The machine's size, its 1.6 m rings of seven segments and a key, and the 50 mm limit come from London's Crossrail tunnels. The cutters' ratings and top speed come from published cutter data. All are rounded, and the machine is not named for any maker.
What does it simplify?
The machine is one stiff body, and the ground changes along the route and with depth but not from side to side. Distances off the line are drawn 10 times bigger so a few centimeters show. The cutters wear out a few times faster than real ones, so a student sees it happen in one drive. The machine never stops for repairs or spoil trains, so it goes faster than a real one's daily average. Nothing caves in on anyone, and buildings settle up to about 10 mm, shown as numbers, and never fall.
Can students share their drive?
Yes. A shared project replays the student's last drive in the cutaway, and File, Drive record prints it on one page. Typed words in a shared project, its name, the machine's name and the program, pass the platform's filter.
Still have a question? Ask us, and a person will write back.
Where to go next
Badge kits and learning kits
Step-by-step projects in Tunnel Boring Lab that end with a certificate: for a scout badge, or for homeschool families and classes.
- Bore a tunnel under the city: Learning kit badge, or the learning kit for grades 6-8
Lesson plans
4 ready-to-teach class periods with a teacher plan, a student worksheet, an exit ticket with answers, and the standards it meets.
Start with Tunnel Boring Lab
Trying it costs nothing and takes about five minutes. An account is what makes the work last.
Tunnel Boring Lab is one of the making apps on the platform. Every level runs on one model of the machine, the ground and the street, so the steering a student learns in Level 2 is the steering they need at breakthrough.