Tower Crane Lab
A crane's load hangs on a rope, so when the trolley stops, the load keeps going and swings like a pendulum. Tower Crane Lab gives every student a tower crane on a building site and a steel beam to put on the third floor. They run the program anyone would write, watch the beam come down swinging, and time one swing with a stopwatch. Then they change the trolley's speed in two steps, half a swing apart, and the swing cancels itself. That is the same idea real cranes sell as an anti-sway system, and a student can say it in one sentence.
Using this with a class? Make a free class and add your students yourself: each gets a username and password, with no email or Google account needed. Or give them one join code. Using Google Classroom? Post the link there; with a free class, the link also puts each student in your class, so you see their work. mytekDev is also available from the Google Workspace Marketplace, so your school's Google admin can install it for everyone.A first lesson: Open it on the projector at Level 1 and press play. The starter program lifts the beam, carries it in and stops. Ask the class what the beam will do when the trolley stops. Let it swing, and have them time one swing out loud. Then ask: would a heavier beam swing faster or slower? Level 4 answers it.
Set up a free class Share to Google ClassroomWhat a student actually does
Level 1 runs a starter program: hoist the beam off the truck, carry it in along the jib, wait, and lower it onto the third floor deck. When the trolley stops, the beam keeps going and swings. The student times one swing with the Stopwatch, and the graph under the swing box shows it as a wave.
Level 2 asks for the beam on the deck swinging less than 0.2 m. The way is to change the trolley's speed in two steps, half a swing apart: half speed, wait half a swing, full speed, and stop the same way. The beam arrives over the deck hanging still.
Level 3 carries the beam low, under 4 m up, so the rope is nearly three times as long. Level 2's waits leave it swinging, and the student has to time the swing again. Level 4 carries a half-tonne pallet of bricks and a 5 t concrete block with the same waits, and both land still: the weight is not in the swing's time.
Level 5 is the load chart. A 4 t flight of precast stairs sits 34 m out by the gate, and the 50 m crane can lift only 2.10 t there. The limiter refuses the lift before the stairs leave the ground. The crane panel shows three cranes and their charts, and the student picks the one that can do it: the bigger crane with its jib cut to 40 m.
Level 6 turns the jib, which swings the beam sideways, and the same two-step idea calms it. Level 7 opens the hook sensor: a program reads the hook's angle in a loop and runs the trolley to calm a swing it did not cause. Wind, a power line, a second crane and hand signals are the levels still to come.
File, Lift plan sets down any level's lift the way a crew's plan does, on one printable page. It lists the crane, each load's weight and rigging, where it is picked up and set down, and what the load chart allows at both points. It gives the lift height, the rope's length and the swing's time, and the steps in words with the speeds and where to start each stop. It draws a map of the site from above with each lift's path, and a graph of the swing from the student's best run.
Level 2, Half a swing: change the trolley's speed in two steps, half a swing apart, and the second step's swing cancels the first. Blocks and Python call the same commands, and the Python tab shows what the blocks say.
What they are learning while they work
Nothing here is presented as a lesson. This is what the levels are made of.
| What the student does | What it is |
|---|---|
| Watches the beam keep going when the trolley stops | Inertia. The rope can only pull the beam along. When the trolley stops, nothing stops the beam at once, so it swings on past. |
| Times one swing with the Stopwatch | Period. A swing out and back takes the same time again and again. That time is the number every later program is built on. |
| Changes speed in two steps, half a swing apart | Cancelling a swing. Each change of speed starts a swing. A second change half a swing later starts one that is exactly opposite, and the two cancel. |
| Carries the beam low and finds the old waits fail | Length sets the period. A longer rope swings more slowly: about 6.3 s on 10 m, 11 s on 30 m. The wait has to change with the rope. |
| Lands half a tonne and five tonnes with the same waits | Mass is not in the period. One swing takes 2 π √(L / g) seconds. The weight changed the hoist's speed and what the crane may lift, not the swing. |
| Is refused by the limiter and reads the load chart | Capacity falls with distance. Further out along the jib, a crane may lift less. A shorter jib lifts more at the same distance, because less of the crane's strength holds up its own jib. |
| Prints a lift plan with each load against the chart | Planning a lift. A crew writes down the load, the chart at the pick and the set down, and the steps before anything leaves the ground. The plan shows a lift that is over the chart before the limiter has to refuse it. |
| Writes a loop that reads the hook sensor and acts | Feedback control. A timed program only knows the rope. A loop that reads, acts and reads again can calm a swing it did not start. |
How to tell whether it landed
Ask, and let them show you on the crane. A student who has understood it can answer these without help.
- The trolley stopped. Why didn't the beam stop with it?
- How long should your wait be between the two speed steps, and how did you find that number?
- You lowered the beam before carrying it, and your program stopped working. What changed?
- Would a 5 t block swing faster or slower than a half-tonne pallet on the same rope? How do you know?
- Why could the crane lift the stairs near the tower but not 34 m out?
- What can a program with the hook sensor do that a program with only waits cannot?
Use it in your subject
Not a technology class? Then the app is how students show what they learned in your unit. More projects for every subject.
Physical science and physics (NGSS MS-PS2-2, HS-PS2-1)
The load lagging behind the trolley and keeping going when it stops, one variable changed at a time: rope length, then mass. High school adds the period as 2 π √(L / g) and the hook-angle graph as data.
Computer science (CSTA 2-AP-12, 2-AP-17, 3A-AP-15)
Sequences with timed waits, one program tested on a short rope and a long one, and a sensor loop set against a timed program: the tradeoff between control structures 3A-AP-15 asks students to justify.
Engineering design (NGSS MS-ETS1, HS-ETS1-4)
A computer simulation used to test a solution against criteria and constraints: landing accuracy and swing against the load chart and the crane's speeds.
Construction and career and technical education
What a tower crane is made of, how its load chart works, and why a crane crew waits for a load to stop swinging. Crane operator is one of the best-paid material moving jobs.
Practical notes
- AgesGrades 6 to 12. Levels 1 to 4 work from grade 6 with a stopwatch and no formula; the period formula, the load chart's shape and the hook sensor loop fit high school physics and CS.
- TimeLevels 1 and 2 fit in a class period with time to talk about the swing. Levels 1 to 7 together take about three periods.
- EquipmentA computer or Chromebook with a modern browser. Nothing to install. A projector for Big screen.
- CostFree. The app has no paid tier and no AI.
- PrepRun Level 1's starter once and time a swing yourself, then pass Level 2 with the two-step change. Open the crane panel from the Crane menu before Level 5.
- In a groupOne crane per student, or pairs: one writes the program, one runs the Stopwatch and reads the swing aloud.
For classes that will never stand on a building site
Real crane training runs on paid simulator seats, and a building site is no place for a class. Here every student runs the crane at once, sees the load swing, and finds the fix for themselves. Nothing falls and nobody is hurt: the limiter and the swing do the teaching.
Common questions
Is it free?
Yes. Tower Crane Lab has no paid tier, and it can be tried right on this page without an account. Saving needs a free account.
Does it work on a Chromebook?
Yes. It runs in the browser with nothing to install.
Do students need to know how to code?
No. Level 1 runs a starter program, and the Blocks tab is drag and drop. Python is there for students who want it, and Start from my blocks turns their blocks into Python.
Do students need the pendulum formula?
No. Middle school students time one swing with the Stopwatch and use that number. High school students can check it against 2 π √(L / g).
Are the crane numbers real?
The load charts and the trolley, turning and hoist speeds come from the data sheets of real flat-top tower cranes, rounded. The cranes in the app are not named for any maker.
What does it simplify?
The load is one swinging weight on one rope: no second swing between the hook and the load, no spin, no stretch in the rope and no bend in the jib. Nothing falls and nobody is hurt; a load over the chart is refused before it leaves the ground.
Can students see each other's work?
Only if they share a project. Typed words in a shared project, its name, the site's name and the program, pass the platform's filter.
Still have a question? Ask us, and a person will write back.
Where to go next
Start with Tower Crane Lab
Trying it costs nothing and takes about five minutes. An account is what makes the work last.
Tower Crane Lab is one of the making apps on the platform. Every level runs on one model of the crane and the swinging load, so the swing a student times in Level 1 is the one their program has to cancel.
Page last reviewed November 2026.
Google, Google Classroom and Chromebook are trademarks of Google LLC.